Pickwick Landing Reservoir Drawdown for Seismic Study
TVA has decided to draw down Pickwick Landing Reservoir to winter pool level at an accelerated rate to support further evaluation of the integrity of Pickwick Landing Dam and enhance safety.
http://www.tva.gov/sites/pickwick.htm