PDA

View Full Version : Pickwick Being Drawn Down at an Accelerated Rate


FlipaYak
09-25-2014, 08:09 AM
Pickwick Landing Reservoir Drawdown for Seismic Study

TVA has decided to draw down Pickwick Landing Reservoir to winter pool level at an accelerated rate to support further evaluation of the integrity of Pickwick Landing Dam and enhance safety.

http://www.tva.gov/sites/pickwick.htm